Identification of Causes and Effects of Poor Communication in Construction Industry: A Theoretical Review

Yaser Gamil, Ismail Abdul Rahman

Abstract


Construction industry is characterized in nature as complex, fragmented, dynamic and involves many parties therefore effective communication is essential to overcome these challenges. Many researchers found that the industry faces major challenge to ensure effective and successful communication throughout the lifecycle of the project which therefore resulted to project failure. Poor communication in construction industry had been addressed in previous research studies; however, this paper presents and examines the identification of causes and effects which lead to poor communication. Further investigations on previous literature were conducted to extract the causes and effects which contributed to poor communication in construction industry. Similarity technique was applied to avoid duplications in the identified causes and effect of poor communication. Using the frequency technique, from the 33 causes of poor communication it was found that the most dominant cause is lack of effective communication. Whereas, out of 21 effects from poor communication, it was found that highly repeated effect is time overrun. These findings will serve a good platform for further investigation on the relevancy of causes and effects to the local construction practitioners.


Keywords


Causes; Effects; Poor Communication; Construction Industry.

References


Anna Dubois & Lars-Erik Gadde “the construction industry as a loosely couple system: implications for productivity and innovation”, Construction Management and Economics, (2002) 20:7, 621-631, DOI: 10.1080/01446190210163543.

Kazi, A. S.”Knowledge management in the construction industry: A socio-technical perspective”. IGI Global. Technology & Engineering (2005).

Abd El-Razek, M. E., Bassioni, H. A., & Mobarak, A. M. “Causes of delay in building construction projects in Egypt”. Journal of Construction Engineering and Management, (2008)133(11), 831-841.

Teo.W.M “Communication: Information Management in the Construction Industry”. University of South Australia. (1991).

Berntzen, P. “Communication and related work problems in the construction industry”. University of Texas at Austin. (1988).

Emmitt, S., & Gorse, C. “Communication in construction teams”. Taylor & Francis. London. (2006).

Dainty, A, Moore, D and Murray, M “Communication in construction: Theory and practice”, Taylor & Francis, London. (2006).

Press Releases “Project Management Institute (PMI)” more than half of all project budget risk is due to ineffective communications” retrieved from (www.pmi.org).(March, 2013).

Abdul Rahman, I., Memon, A. H., Karim, A., & Tarmizi, A. “Significant factors causing cost overruns in large construction projects in Malaysia”. Journal of Applied Science, (2013) 13(2), 286-293.

Emuze, F., & James, M. “Exploring communication challenges due to language and cultural diversity on South African construction sites”. Acta Structilia, (2013)20(1), 44-65.

Lee, J., & Bernold, L. E. “Ubiquitous agent-based communication in construction”. Journal of Computing in Civil Engineering, (2008) 22(1), 31-39.

Tai, S., Wang, Y., & Anumba, C. J. “A survey on communications in large-scale construction projects in China. Engineering” Construction and Architectural Management, (2009)16(2), 136-149.

Oshodi Olalekan, S., & Iyagba Rimaka “A comparative study on causes and effects of delay in Nigerian and Iranian construction projects”. Asian Journal of Business and Management Sciences .Vol. 3 No. 01 [29-36] (2013).

Darvik, L., & Larsson, J. “The Impact of Material Delivery-Deviations on Costs and Performance in Construction Projects”. Master’s Thesis in the Design and Construction Project Management. Chalmers University of technology. Sweden. (2010).

Gunhan, S., Senol, G., & Dogan, S. Z. “Non-verbal cues: improving communication in construction projects”. American Society for Engineering Education. (2012).

Cheng, Eddie WL, Heng Li, Peter ED Love, and Zahir Irani. "Network communication in the construction industry." Corporate Communications: An International Journal 6, no. 2 (2001): 61-70.

Fichet, H., & Giraud, L. “How the information flow is processed in project-based companies compared to others and how it affects strategic drift”. Master thesis. UMEA school of business .Sweden. (2007).

Luka Goji Tipili, Patricia Oyiza Ojeba and Muhammad Sa'adiya Ilyasu “Evaluating the effects of communication in construction project delivery in Nigeria”. Global Journal of Environmental Science and Technology: ISSN-2360-7955, Vol. 2(5): pp 048-054, June, 2014.

Gebken, R. J., & Gibson, G. E. “Quantification of costs for dispute resolution procedures in the construction industry”. Journal of professional issues in engineering education and practice, (2006) 132(3), 264-271.

Sinha, M., & Wayal, A. S. “Dispute Causation in Construction Projects”. IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE). (2007).

Chan, D. W., & Kumaraswamy, M. M. “A comparative study of causes of time overruns in Hong Kong construction projects”. International Journal of project management, (1997).15(1), 55-63.

Loosemore, M., & Muslmani, H. A. “Construction project management in the Persian Gulf: inter-cultural communication”. International Journal of Project Management, (1999)17(2), 95-100.

Adnan Enshassi Jomah Al-Najjar Mohan Kumaraswamy, “Delays and cost overruns in the construction projects in the Gaza Strip", Journal of Financial Management of Property and Construction, (2009) Vol. 14 Iss 2 pp. 126 – 151.

Faridi, A. S., & El‐Sayegh, S. M. “Significant factors causing delay in the UAE construction industry”. Construction Management and Economics, (2006) 24(11), 1167-1176.

Oluwaseun Sunday, D., & Olumide Afolarin, A. “Causes, effects and remedies of errors in Nigerian construction documents”. Organization, Technology & Management in Construction: An International Journal, (2013) 5(1), 676-686.

Love, P. E., & Li, H. “Quantifying the causes and costs of rework in construction”. Construction Management & Economics, (2000) 18(4), 479-490.

Sambasivan, M., & Soon, Y. W. “Causes and effects of delays in Malaysian construction industry”. International Journal of project management, (2007) 25(5), 517-526.

Alhomidan, A. “Factors affecting cost overrun in road construction projects in Saudi Arabia”. International Journal of Civil & Environmental Engineering, IJEE-IJENS, (2010)13(3).

Enshassi, A., Al-Hallaq, K., & Mohamed, S.” Causes of contractors’ business failure in developing countries: the case of Palestine”. Journal of construction in developing countries, (2006) 11(2), 1-14.

Ahuja, Vanita and Yang, Jay and Shankar, Ravi “Web Based Communication for Construction Project Management”. In Proceedings World Conference on Accelerating Excellence in the Built Environment. (2006).

Thomas, S., Tucker, R., and Kelly, W. “Critical communications variables.” J. Constr. Eng. Manage., 129, 1, 58–66. (1998).

Bandulahewa, B. K. M. “Effective project communication for construction project managers in Sri Lanka”. Master thesis, University of Moratuwa Sri Lanka. (2015).

Nguyen, T. P., & Chileshe, N. “Revisiting the Critical Factors Causing Failure of Construction Projects in Vietnam”. (Doctoral dissertation, Association of Researchers in Construction Management). (2013).

Kasimu, M. A., & Abubakar, D. I. “Causes of delay in Nigeria construction industry”. The Journal of contemporary research in business, 4(2). (2012).

Tumi, S. A. H., Omran, A., & Pakir, A. H. K. “Causes of delay in construction industry in Libya”. In the International Conference on Economics and Administration (pp. 265-272). (2009, November).

Hoezen, M. E. L., Reymen, I. M. M. J., & Dewulf, G. P. M. R. “The problem of communication in construction”. (Paper presented at the CIB W96 Adaptable Conference, University of Twente). (2006).

Assah-Kissiedu, M., Fugar, F. D. K., & Badu, E.” Triggers of disputes within the Ghanaian construction industry”. In Proceedings 5th Built Environment Conference (2010, July). (Vol. 18, p. 20).

Mezher, T. M., & Tawil, W. “Causes of delays in the construction industry in Lebanon”. Engineering, Construction and Architectural Management, 5(3), 252-260. (1998).

Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S.” Analyzing factors affecting delays in Indian construction projects”. International Journal of Project Management, 30(4), 479-489. (2012).

Laihonen, H., Vuolle, M., & Käpylä, J. “Negative Customer Experiences and Intellectual Liabilities in Construction Industry”. In Proceedings of the 11th International Conference on Intellectual Capital, Knowledge Management and Organizational Learning: ICICKM2014 (p. 274). Academic Conferences Limited. (2014, October).

M. Haseeb, LuXinhai, Aneesa Bibi, Qazi Gulam Raqeeb. “A case study on: Importance of Delay Causes in Construction Projects of Pakistan”. Asian Journal of Business and Management Sciences ISSN: 2047-2528 (2012) Vol. 1 No. 10 [94-101], www.ajbms.org.

Loosemore, M., & Lee, P. “Communication problems with ethnic minorities in the construction industry”. International Journal of Project Management, 20(7), 517-524. (2002).

Ali, A. S., & Wen, K. H.” Building defects: Possible solution for poor construction workmanship”. Journal of Building Performance, 2(1). (2011).

Waziri, F., & Khalfan, S. “Cross-Cultural Communication in Construction Industry: How do Chinese Firms Cross the Barriers in Tanzania”. European Journal of Business and Management, 6(13), 118-122. (2014).

Baguley, Phil “Effective communication for modern business”. McGraw-Hill, London; New York. (1994).

Khahro, S. H., & Ali, T. H. “Causes Leading to Conflicts in Construction Projects: A Viewpoint of Pakistani Construction Industry”. International Conference on challenges in IT, Engineering and Technology (ICCIET’2014) July 17-18, 2014 Phuket (Thailand).

Thorpe, T., & Mead, S. “Project-specific web sites: Friend or foe?” Journal of Construction Engineering and Management. (2001).

Aulich, T. “The role of effective communication in the construction Industry: a guide for education and health clients”. Australasian Journal of Construction Economics and Building, 13 (4) 92-101. (2013).

Sadi Assaf, Mohammad A. Hassanain and Salman Al-Zahrani X”Causes of Contractors’ Failure in Industrial Projects in Saudi Arabia” Research Journal of Applied Sciences, Engineering and Technology 9(3): 158-164, 2015 ISSN: 2040-7459; e-ISSN: 2040-7467. (2012)

Gidado, Kassim and Niazai, Ghulam “Causes of project delay in the construction industry in Afghanistan”: EPPM2012, University of Brighton, UK, 10-11th September, (2012)

Apolot, R., Alinaitwe, H., & Tindiwensi, D.” An investigation into the causes of delay and cost overrun in Uganda’s public sector construction projects”. In Second International Conference on Advances in Engineering and Technology (pp. 305-311). (2011).

Mydin, M. O., Sani, N. M., Salim, N. A., & Alias, N. M. “Assessment of Influential Causes of Construction Project Delay in Malaysian Private Housing from Developer’s Viewpoint”. In E3S Web of Conferences (Vol. 3, p. 01027). EDP Sciences. (2014).

Al‐Kharashi, A., & Skitmore, M. “Causes of delays in Saudi Arabian public sector construction projects”. Construction Management and Economics, (2009) 27(1), 3-23.

Liao, P. C., Lei, G., Fang, D., & Liu, W. “The relationship between communication and construction safety climate in China”. KSCE Journal of Civil Engineering, 18(4), 887-897. (2014).

Lo, T. Y., Fung, I. W., & Tung, K. C. “Construction delays in Hong Kong civil engineering projects”. Journal of Construction Engineering and Management, 132(6), 636-649. (2006).

Kikwasi, G. “Causes and effects of delays and disruptions in construction projects in Tanzania”. In Australasian Journal of Construction Economics and Building-Conference Series (Vol. 1, No. 2, pp. 52-59). (2013, February).

Cerić, A. “The impact of asymmetric information on communication risk in construction projects”. In Engineering Project Organization Conference. Hrvatska znanstvena bibliografija i MZOS-Svibor. (2010, January).

Mitkus, S., & Mitkus, T. “Causes of conflicts in a construction industry: A communicational approach”. Procedia-Social and Behavioral Sciences, (2014)110, 777-786.

Gould, N. “Dispute resolution in the construction industry: an evaluation of British practice”. Thomas Telford. (1999).

Zulch, B. G. “The Construction Project Manager as Communicator in the Property Development and Construction Industries”. Doctoral dissertation, University of the Free State. (2012).

Jaffar, N., Tharim, A. A., & Shuib, M. N. “Factors of conflict in construction industry: a literature review”. Procedia Engineering, (2011)20, 193-202.

Moura, H. M. P., & Teixeira, J. M. C. “Managing stakeholders’ conflicts. Construction stakeholder management”, 286-316.Chinyio, E., & Olomolaiye, P. (Eds.) John Wiley & Sons. (2010).

Dingsdag, D. P., Sheahan, V. L., & Biggs, H. C. “Safety Culture in the Construction Industry: Changing behavior through enforcement and education”. In Proceedings Clients Driving Innovation: Moving Ideas into Practice. The Second International Conference of the CRC for Construction Innovation. (2006).

Nagapan, S., Rahman, I. A., & Asmi, A. “Factors Contributing to Physical and Non-Physical Waste Generation in Construction Industry”. International Journal of Advances in Applied Sciences, (2012)1(1), 1-10.

Haslam, R. A., Hide, S. A., Gibb, A. G., Gyi, D. E., Pavitt, T., Atkinson, S., & Duff, A. R. “Contributing factors in construction accidents”. Applied ergonomics, (2005)36(4), 401-415.

Salleh, N. A., Nordin, N. M., & Rashid, A. K. A. “The language problem issue among foreign workers in the Malaysian construction industry”. International Journal of Business and Social Science, (2012)3(11), 97-99.

Alwi, Sugiharto and Hampson, Keith and Mohamed, Sherif “Waste in the Indonesian construction projects”. In Proceedings, the 1st International Conference of CIB W107 - Creating a sustainable Construction Industry in Developing Countries, pages pp. 305-315, South Africa. (2002).

Lessio, D., Philip, M., Wynn, D. C., & Clarkson, P. J. “Communication and design process planning: initial insights from literature and industry interviews”. In DS 58-Proceedings of ICED 09, the 17th International Conference on Engineering Design, Vol. 1, Design Processes, Palo Alto, CA, USA, 24.-27.08. 2009.


Full Text: PDF

DOI: 10.28991/ijse-01121

Refbacks

  • There are currently no refbacks.


Copyright (c) 2018 Yaser Gamil