Continuous Integration of Risk Management in a Business Process Reengineering: Towards Optimization through Machine Learning

Hicham Raffak, Abdellah Lakhouili, Mohamed Mansouri

Abstract


To improve their market position and competitiveness, organizations aim to shorten production times, cut costs, and boost the quality and variety of their products. While Business Process Reengineering (BPR) is a good method to achieve these goals, implementing it can be risky: any change to a task in the initial process directly affects the final process's performance in terms of time, cost, and quality. This article, drawing on design science, a literature review, and a field study with responses from executives and managers of two companies in the aerospace and automotive sectors in Morocco to measure their satisfaction and identify their risk management needs, provides an overview of the BPR method, its implementation frameworks and methodologies, and explains the importance of risk management in such projects. It suggests an improved continuous risk management process for BPR projects that enhances the gathering and use of risk management data through machine learning.

 

Doi: 10.28991/ESJ-2024-08-03-019

Full Text: PDF


Keywords


BPR; Risk Management; Continuous Integration; Machine Learning.

References


Harmon, P. (2019). Business Process Change: A Business Process Management Guide for Managers and Process Professionals. Morgan Kaufmann, Burlington, United States. doi:10.1016/C2017-0-02868-9.

Nisar, Q. A., Ahmad, S., & Ahmad, U. (2014). Exploring factors that contribute to success of business process reengineering and impact of business process reengineering on organizational performance: A qualitative descriptive study on banking sector at Pakistan. Asian Journal of Multidisciplinary Studies, 2(6), 219-224.

Tsakalidis, G., & Vergidis, K. (2017). Towards a comprehensive business process optimization framework. Proceedings - 2017 IEEE 19th Conference on Business Informatics, CBI 2017, 1, 129–134. doi:10.1109/CBI.2017.39.

Ghanadbashi, S., & Ramsin, R. (2016). Towards a method engineering approach for business process reengineering. IET Software, 10(2), 27–44. doi:10.1049/iet-sen.2014.0223.

Aslı, E. R. İ. M., & Vayvay, O. (2010). Is the Business Process Reengineering (BPR) proved itself to be a trustable change management approach for multinational corporations? Case studies from the literature. Havacılık ve Uzay Teknolojileri Dergisi, 4(4), 23-30.

Goksoy, A., Ozsoy, B., & Vayvay, O. (2012). Business Process Reengineering: Strategic Tool for Managing Organizational Change an Application in a Multinational Company. International Journal of Business and Management, 7(2), 89-112. doi:10.5539/ijbm.v7n2p89.

Razalli, M. R., Ringim, K. J., Hasnan, N., & Hassan, M. G. (2015). A Framework of Best Practices in Managing Business Reengineering for Islamic. Journal of Advanced Management Science, 3(1), 22–25. doi:10.12720/joams.3.1.22-25.

Lal Bhaskar, H. (2016). A critical analysis of information technology and business process reengineering. International Journal of Productivity and Quality Management, 19(1), 98–115. doi:10.1504/IJPQM.2016.078018.

Chiplunkar, C., Deshmukh, S. G., & Chattopadhyay, R. (2003). Application of principles of event related open systems to business process reengineering. Computers and Industrial Engineering, 45(3), 347–374. doi:10.1016/S0360-8352(03)00029-9.

Hussain, M., Saleh, M., Akbar, S., & Jan, Z. (2014). Factors affecting readiness for business process reengineering-developing and proposing a conceptual model. European Journal of Business and Management, 6(1), 55-60.

Habib, M. N., & Shah, A. (2013, February). Business process reengineering: Literature review of approaches and applications. Proceedings of 3rd Asia-Pacific Business Research Conference, 25-26 February, Kuala Lumpur, Malaysia.

Alghamdi, H. A., Alfarhan, M. A., & AL-Ghamdi, A. A.-M. (2014). BPR: Evaluation of Existing Methodologies and Limitations. International Journal of Computer Trends and Technology, 7(4), 224–227. doi:10.14445/22312803/ijctt-v7p154.

Weerakkody, V., Janssen, M., & Dwivedi, Y. K. (2011). Transformational change and business process reengineering (BPR): Lessons from the British and Dutch public sector. Government Information Quarterly, 28(3), 320–328. doi:10.1016/j.giq.2010.07.010.

Bhaskar, H. L. (2018). Business process reengineering framework and methodology: A critical study. International Journal of Services and Operations Management, 29(4), 527–556. doi:10.1504/IJSOM.2018.090456.

Ispas, L., Mironeasa, C., & Silvestri, A. (2023). Risk-Based Approach in the Implementation of Integrated Management Systems: A Systematic Literature Review. Sustainability (Switzerland), 15(13), 10251. doi:10.3390/su151310251.

Saltz, J. S., & Dewar, N. (2019). Data science ethical considerations: a systematic literature review and proposed project framework. Ethics and Information Technology, 21(3), 197–208. doi:10.1007/s10676-019-09502-5.

Hashem, G. (2020). Organizational enablers of business process reengineering implementation: An empirical study on the service sector. International Journal of Productivity and Performance Management, 69(2), 321–343. doi:10.1108/IJPPM-11-2018-0383.

Cirne, R., Melquiades, C., Leite, R., Leijden, E., Maciel, A., & Neto, F. B. de L. (2020). Data Mining for Process Modeling: A Clustered Process Discovery Approach. Annals of Computer Science and Information Systems. doi:10.15439/2020f95.

Bayomy, N. A., Khedr, A. E., & Abd-Elmegid, L. A. (2024). A configurable mining approach for enhancing the business processes’ performance. Knowledge and Information Systems, 66(4), 2537–2560. doi:10.1007/s10115-023-02011-4.

Yin, G. (2010). BPR Application. Modern Applied Science, 4(4), 1-96. doi:10.5539/mas.v4n4p96.

Hammer, M., & Champy, J. (1993). Reengineering the corporation: A manifesto for business revolution. Business Horizons, 36(5), 90–91. doi:10.1016/S0007-6813(05)80064-3.

Hammer, M. (1990). Reengineering work: Don't automate, obliterate. Harvard Business Review, 68(4), 104-112.

Kontio, J. (2007). Business process re-engineering: a case study at Turku University of Applied Sciences. In Proc. of European and Mediterranean Conference on Information Systems, 24-26 June, 2007, Polytechnic University of Valencia, Valencia, Spain.

Setegn, D., Ensermu, M., & Moorthy, P. K. (2013). Assessing the effect of business process reengineering on organizational performance: A case study of Bureau of Finance and Economic Development (BOFED), Oromia Regional State, Ethiopia. Researchers World, 4(1), 115.

Bhaskar, H. L., & Singh, R. P. (2014). Business process reengineering: a recent review. Bhaskar, HL, and Singh, RP (2014). Business process reengineering: a recent review. Global Journal of Business Management, 8(2), 24-51.

Eke, G. J., & Achilike, A. N. (2014). Business process reengineering in organizational performance in Nigerian banking sector. Academic Journal of Interdisciplinary Studies, 3(5), 113-124.

Mlay, S. V., Zlotnikova, I., & Watundu, S. (2013). A quantitative analysis of business process reengineering and organizational resistance: the case of Uganda. The African Journal of Information Systems, 5(1), 1-27.

Jamali, G. (2012). Business Process Reengineering Implementation: Developing a Causal Model of Critical Success Factors. International Journal of E-Education, e-Business, e-Management and e-Learning, 1(5), 354–358. doi:10.7763/ijeeee.2011.v1.58.

Al-Anqoudi, Y., Al-Hamdani, A., Al-Badawi, M., & Hedjam, R. (2021). Using machine learning in business process re-engineering. Big Data and Cognitive Computing, 5(4), 61. doi:10.3390/bdcc5040061.

Omidi, A., & Khoshtinat, B. (2016). Factors Affecting the Implementation of Business Process Reengineering: Taking into Account the Moderating Role of Organizational Culture (Case Study: Iran Air). Procedia Economics and Finance, 36, 425–432. doi:10.1016/s2212-5671(16)30058-2.

van Dun, C., Moder, L., Kratsch, W., & Röglinger, M. (2023). ProcessGAN: Supporting the creation of business process improvement ideas through generative machine learning. Decision Support Systems, 165. doi:10.1016/j.dss.2022.113880.

Watton, R. (2015). Project Management Framework: A Structure for All Organizations. PMF Management Solutions, Riga, Latvia.

Mendling, J., Baesens, B., Bernstein, A., & Fellmann, M. (2017). Challenges of smart business process management: An introduction to the special issue. Decision Support Systems, 100, 1–5. doi:10.1016/j.dss.2017.06.009.

Chountalas, P. T., & Lagodimos, A. G. (2019). Paradigms in business process management specifications: a critical overview. Business Process Management Journal, 25(5), 1040–1069. doi:10.1108/BPMJ-01-2018-0023.

Binci, D., Belisari, S., & Appolloni, A. (2020). BPM and change management: An ambidextrous perspective. Business Process Management Journal, 26(1), 1–23. doi:10.1108/BPMJ-06-2018-0158.

Supriya Bhasin, S. S. Dhami, S. B., S. S. D. (2018). Business Process Reengineering - The Role of Human Resource Function, A Comprehensive Review of Literature. International Journal of Business Management & Research, 8(4), 1–18. doi:10.24247/ijbmraug20181.

Cross, K. F., Feather, J., & Lynch, R. L. (1994). Corporate renaissance: The art of reengineering. Blackwell, Hoboken, United States.

Zaini, Z., & Saad, A. (2019). Business Process Reengineering as the Current Best Methodology for Improving the Business Process. Journal of ICT in Education, 6, 66–85. doi:10.37134/jictie.vol6.7.2019.

Antony, J., Snee, R., & Hoerl, R. (2017). Lean Six Sigma: yesterday, today and tomorrow. International Journal of Quality and Reliability Management, 34(7), 1073–1093. doi:10.1108/IJQRM-03-2016-0035.

Salah, S., & Rahim, A. (2018). An integrated company-wide management system. Springer, Cham, Switzerland. doi:10.1007/978-3-319-99034-7.

Goyal, A., Agrawal, R., Chokhani, R. K., & Saha, C. (2019). Waste reduction through Kaizen approach: A case study of a company in India. Waste Management and Research, 37(1), 102–107. doi:10.1177/0734242X18796205.

Project Management Institute. (2009). A Guide to the Project Management Body of Knowledge: PMBOK Guide (4th Ed.) Project Management Institute, Pennsylvania, United States.

ISO 31000:2009. (2009). Risk management-Principles and guidelines. International Organization for Standardization (ISO), Geneva, Switzerland.

Kloss-Grote, B., & Moss, M. A. (2008). How to measure the effectiveness of risk management in engineering design projects? Presentation of RMPASS: A new method for assessing risk management performance and the impact of knowledge management-including a few results. Research in Engineering Design, 19(2–3), 71–100. doi:10.1007/s00163-008-0049-y.

Aven, T. (2015). Risk analysis. John Wiley & Sons, Hoboken, United States. doi:10.1002/9781119057819.

Zio, E. (2007). An introduction to the basics of reliability and risk analysis. World Scientific, Singapore. doi:10.1142/6442.

Lee, D., Rho, B. H., & Yoon, S. N. (2015). Effect of investments in manufacturing practices on process efficiency and organizational performance. International Journal of Production Economics, 162, 45–54. doi:10.1016/j.ijpe.2015.01.001.

ISO 31010:2009. (2009). Risk management-Risk assessment techniques. International Organization for Standardization (ISO), Geneva, Switzerland.

Ulrich, K. T., & Eppinger, S. D. (2016). Product design and development. McGraw-Hill, New York, United States.

PwC. (2015). How to achieve excellent enterprise risk management: Why risk assessments fail. PricewaterhouseCoopers, London, UK. Available online: https://www.pwc.ch/de/publications/2016/pwc_excellent_enterprise_risk_management_e.pdf (accessed on May 2024).

Duvall, P. M., Matyas, S., & Glover, A. (2007). Continuous integration: improving software quality and reducing risk. Pearson Education, London, United Kingdom.

Fowler, M., & Foemmel, M. (2006). Continuous integration. Martinfowler, Chicago, United States. Available online: https://www.martinfowler.com/articles/continuousIntegration.html (accessed on May 2024).

Williamson, D. (2017). Agile Project Management for Lean Process Improvement. Virginia Tech Roanoke Center, Virginia, United States. Available online: https://www.vtrc.vt.edu/index.html (accessed on April 2024).

Charron-Latour, J., Bassetto, S., & Pourmonet, H. (2017). STARS: the implementation of a Computer-Aided Employee Suggestion Management System to operationalize a continuous improvement process. Cognition, Technology and Work, 19(1), 179–190. doi:10.1007/s10111-016-0401-3.

Restrepo, D., Charron-Latour, J., Pourmonet, H., & Bassetto, S. (2016). Seizing opportunities for change at the operational level. International Journal of Health Care Quality Assurance, 29(3), 253–266. doi:10.1108/IJHCQA-02-2015-0022.

Gammell, C. (2017). Continuous Integration in Product Design. Available online: https://medium.com/digital-transformation-and-platform-engineering/a-quick-guide-to-continuous-integration-and-continuous-delivery-4df594ae281 (accessed on May 2024).

Eckert, C. M., Wynn, D. C., Maier, J. F., Albers, A., Bursac, N., Xin Chen, H. L., Clarkson, P. J., Gericke, K., Gladysz, B., & Shapiro, D. (2017). On the integration of product and process models in engineering design. Design Science, 3. doi:10.1017/dsj.2017.2.

Capilla, R., Jansen, A., Tang, A., Avgeriou, P., & Babar, M. A. (2016). 10 years of software architecture knowledge management: Practice and future. Journal of Systems and Software, 116, 191–205. doi:10.1016/j.jss.2015.08.054.

Hopkin, P. (2018). Fundamentals of risk management: understanding, evaluating and implementing effective risk management. Kogan Page Publishers, London, United Kingdom.

Musil, J., Ekaputra, F. J., Sabou, M., Ionescu, T., Schall, D., Musil, A., & Biffl, S. (2017). Continuous Architectural Knowledge Integration: Making Heterogeneous Architectural Knowledge Available in Large-Scale Organizations. 2017 IEEE International Conference on Software Architecture (ICSA). doi:10.1109/icsa.2017.28.

Li, Y., Tarafdar, M., & Subba Rao, S. (2012). Collaborative knowledge management practices. International Journal of Operations & Production Management, 32(4), 398–422. doi:10.1108/01443571211223077.

Dorofee, A. J., Walker, J. A., Alberts, C. J., Higuera, R. P., & Murphy, R. L. (1996). Continuous Risk Management Guidebook. Defense Technical Information Center, Carnegie-Mellon University, Pittsburgh, United States. doi:10.21236/ada319533.

Chandrinos, S. K., Sakkas, G., & Lagaros, N. D. (2018). AIRMS: A risk management tool using machine learning. Expert Systems with Applications, 105, 34–48. doi:10.1016/j.eswa.2018.03.044.

Bissonette, M. M. (2016). Project risk management: a practical implementation approach. Project Management Institute, Newtown Square, United States.

Cacciabue, P. C., Cassani, M., Licata, V., Oddone, I., & Ottomaniello, A. (2015). A practical approach to assess risk in aviation domains for safety management systems. Cognition, Technology and Work, 17(2), 249–267. doi:10.1007/s10111-014-0294-y.

Baumeister, J., Seipel, D., & Puppe, F. (2009). Agile Development of Rule Systems. Handbook of Research on Emerging Rule-Based Languages and Technologies, 253–272, IGI Global, Hershey, United States. doi:10.4018/978-1-60566-402-6.ch011.

Gu, J., & Zhang, L. (2014). Data, DIKW, big data and data science. Procedia Computer Science, 31, 814–821. doi:10.1016/j.procs.2014.05.332.

Choi, T. M., Chan, H. K., & Yue, X. (2017). Recent Development in Big Data Analytics for Business Operations and Risk Management. IEEE Transactions on Cybernetics, 47(1), 81–92. doi:10.1109/TCYB.2015.2507599.

Zhang, Y., Ren, S., Liu, Y., & Si, S. (2017). A big data analytics architecture for cleaner manufacturing and maintenance processes of complex products. Journal of Cleaner Production, 142, 626–641. doi:10.1016/j.jclepro.2016.07.123.

Gregor, S., & Hevner, A. R. (2013). Positioning and Presenting Design Science Research for Maximum Impact. MIS Quarterly, 37(2), 337–355. doi:10.25300/misq/2013/37.2.01.

Hevner, A., & Chatterjee, S. (2010). Design Science Research in Information Systems. Design Research in Information Systems, 9–22, Springer, United States. doi:10.1007/978-1-4419-5653-8_2.


Full Text: PDF

DOI: 10.28991/ESJ-2024-08-03-019

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 RAFFAK HICHAM, LAKHOUILI Abdallah, MANSOURI Mohamed